Basics
- Category: Infrastructure
- Type: Military
- Status: Completed Project
Description
-
Description:
We successfully completed a critical repair project on the runway, taxiways, and hammerheads, ensuring the continued safe and efficient operation of airfield infrastructure. Key aspects of the project included:
- Asphalt Crack Repairs: Comprehensive crack repairs on the asphalt portion of the runway to prevent further damage and ensure smooth, safe aircraft operations.
- Concrete Replacement: Replacing damaged or deteriorated concrete sections on the hammerheads and touchdown areas, restoring structural integrity and supporting high-impact landings.
- Enhanced Durability: All repairs were completed using high-quality materials and techniques to ensure long-lasting performance under heavy traffic and environmental conditions.
This project underscores our expertise in airfield infrastructure, delivering timely and effective repairs that enhance safety and operational efficiency on critical military and civilian airfields.
Show all description
Project Information
- Name: Repair of Runway on AASAB
- Statement of Work: Repair runway, taxiways, and hammerhead by performing crack repairs on the asphalt part of the runway, replacing concrete on hammerheads and touchdown areas